Road Crossing in Shawnigan Lake
Project Details
Now to install the pipe.. backfill with road base and compact, cold patch for the time being, after all the road crossings are in, paving crew will reinstate. Great winter project! Backfill, civil crew, december, Driveway, excavator, road base, Road Crossing, sand, sewer drain, sewer line, utility construction, vancouver island, Water Line, Yanmar